Quality Control

Inspection closes the build before shipment.

Finished equipment is checked against approved drawings and inspection checklists. Visual condition, dimensional conformity and operating function are verified, critical items are checked before release, and the result is recorded in the final inspection report.

Finished-machine release record Final inspection
Reference Approved equipment drawing paired with the applicable checklist
Verification Visual inspection, caliper measurement and functional test
Critical items Checked at 100% frequency
Finished units Final inspection applies to all finished products
Record Recorded release-inspection report
Every finished unit Included in the final inspection scope
100% Check frequency for critical items
3 methods Visual, dimensional and functional verification
Recorded Final inspection result retained as a report
Finished Equipment Checks

Three areas are verified before release.

The final inspection scope covers the machine’s visible condition, dimensional conformity and operating function before shipment.

01

Visual condition

The finished unit receives a visual inspection as part of the release check.

02

Dimensional conformity

Dimensions are verified with caliper measurement against the approved drawing and inspection requirements.

03

Operating function

Functional testing is used to verify the finished machine before shipment release.

Inspection Method

The check follows defined references and methods.

The inspection record is tied to the approved drawing and the inspection checklist rather than an informal visual release.

01

Approved equipment drawing

The approved drawing provides the dimensional and configuration reference for the finished machine.

02

Applicable inspection checklist

The checklist defines the items to be verified during final inspection.

03

Visual inspection

Visible condition is checked as part of the finished-machine inspection.

04

Caliper measurement

Caliper measurement is used for dimensional verification where specified by the inspection requirements.

05

Functional test

Machine function is tested before the finished unit is released for shipment.

Release Control

Critical items are checked at full frequency.

Final inspection applies to finished products, with critical items checked at 100% frequency. The completed result is recorded in the final inspection report.

100% Inspection frequency for critical items before shipment release.
Inspection scope Finished products
Critical-item frequency 100%
Reference documents Approved equipment drawing paired with the applicable checklist
Inspection methods Visual inspection, caliper measurement and functional test
Release record Recorded release-inspection report
Quality Documents

Records cover conformity, inspection and acceptance.

The supplied company records include conformity documentation for diamond wire saw equipment, final inspection documentation and a customer acceptance record.

Conformity documentation

CE conformity documentation is included in the supplied records for diamond wire saw equipment.

CE documentation

Final inspection documentation

The final inspection result is retained as a report after the defined checks are completed.

Inspection record

Customer acceptance record

The supplied records include customer acceptance for a TCQF cutting and filtration equipment package used in a Japan optical project.

Customer acceptance
Acceptance Record

A delivered package documented through customer acceptance.

A customer acceptance record in the supplied materials covers a TCQF cutting and filtration equipment package for an optical project in Japan.

Market Japan
Application Optical project
Equipment record TCQF cutting equipment
Package record Cutting and filtration equipment
Quality Documentation

Request the documents relevant to your equipment order.

Contact the team to discuss the inspection documentation or conformity records relevant to the equipment under review.