Built on the factory floor, checked before release.
The Shanghai production base carries out equipment fabrication, precision component work, mechanical assembly and final checks before finished machines are released for shipment.

Work moves through defined production areas.
The production base covers incoming checks, metal fabrication, component work, mechanical assembly and commissioning activities before final release.
Incoming inspection
Incoming parts and materials enter the production flow through inspection before fabrication and assembly work begins.
Metal fabrication
Sheet-metal cutting, forming and welding support machine frames, guards and structural parts used in equipment builds.
Precision component work
Machined parts, motion components and fitted assemblies are checked during production before they move into machine assembly.
Mechanical assembly
Motion systems, guides, drive components, guards and controls are brought together before commissioning and release checks.
The build is controlled before final inspection.
Factory work is separated into clear production activities so structural work, component preparation and machine assembly can be checked before the finished unit reaches the final inspection stage.
Fabrication
Frame and sheet-metal work includes cutting, forming and welding activities used to prepare machine structures and protective parts.
Component preparation
Precision parts and motion-related components are prepared and checked before they are fitted into the equipment build.
Machine assembly
Mechanical parts, linear motion elements and control hardware are assembled into the finished machine configuration.
Commissioning
The completed machine is operated and checked before it enters the final inspection and shipment release stage.
Release depends on documented checks.
Finished products are inspected for appearance, dimensions and function. The inspection standard is the approved drawing and inspection checklist, with critical items checked before shipment.
The release check is tied to production documents.
The final inspection process links the finished machine to the approved drawing, the inspection checklist and the recorded inspection result.
Approved drawing
Dimensional and configuration checks refer back to the approved drawing used for the finished equipment.
Inspection checklist
Appearance, dimensions and function are checked against the inspection checklist before shipment release.
Final inspection report
The final inspection result is recorded as the release record for the finished machine.